Corridor projects, Germany

NKT is a major supplier for two of the Corridor power link projects essential for the green transformation in Germany. SuedOstLink will be the world’s first large commercial 525 kV XLPE high-voltage DC 2GW transmission line and SuedLink will be the world’s longest HVDC underground power link.

Key facts – NKT sections of SuedOstLink and SuedLink

Principal - SuedOstLink

50Hertz

Principal - SuedLink

TennetT and TransnetBW

Location - SuedOstLink

Eastern part of Germany

Location - SuedLink

Northern, central and southern Germany

Quality of order - SuedOstLink

Two 525 kV HVDC XLPE onshore cable systems (3 lots each), accessories and installation with a power rating of 2 GW each (4 GW in total)

Quality of order - SuedLink

Cable, accessories and installation of the Western section of 525 kV HVDC XLPE onshore cable systems with a power rating of 2 GW each

Route length - SuedOstLink

Approx. 275 km

Route length - SuedLink

Approx. 750 km

Duration - SuedOstLink

Awarded in 2020 and 2022 - scheduled completion from 2025

Duration - SuedLink

Awarded in 2020 - scheduled completion 2026

The German Corridors

cable drum transport loading
HVDC Cable
Cale laying in trench for NordLink with construction personell
cable drums on production site
Cable drum with HV cable and NKT car

SuedLink

The 2 GW SuedLink HVDC project will cover a total of almost 1340 km – key for the green transformation of Germany.

Germany map with corridor projects and NKT sections

SuedOstLink

The 2 GW SuedOstLink will cover a total of 580 km, from Saxony-Anhalt to Bavaria.

Innovation

525 kV extruded HVDC cable systems

Doubling power transmission over longer distances